MBS MB3-430 Exam Dumps
Exam : MBS MB3-430
Title : GP 9.0 Manufacturing Applications
1. The lead time offset for materials on the BOM can be calculated from which of the following dates?
A. Manufacturing Order Due Date only
B. Manufacturing Order Start Date only
C. Manufacturing Order Due Date or Start Date
D. No offset date can be chosen
Answer: C
2. To make changes to a manufacturing (active) routing without changing the planning routing first, what window is used?
A. Manufacturing Order Routing Sequence Edit window
B. Routing Utilities window
C. Routing Sequence Entry window
D. Routing Query window
Answer: A
3. When setting up a new actual cost finished good item, which of the following accounts should be set up if both material and labor data will be collected for the item? Choose the 2 that apply.
A. Standard Cost Revaluation
B. WIP – Material
C. Variance – Material
D. WIP – Labor
Answer: BD
4. When copying a routing which of the following steps are possible? Choose the 4 that apply.
A. Creating a header record
B. Copying a sequence of steps
C. Copying an entire routing
D. Renumber routing sequences
Answer: ABCD
5. Account numbers for standard cost items can be defined in which window? Choose the 2 that apply.
A. Item Account Maintenance window
B. Item Account Maintenance – Costing window
C. Standard Item Material Cost Window
D. Roll Up and Revalue Inventory Window
Answer: AB